Thursday, December 4, 2014

Let's Talk Equivilent Residential Units (ERUs)

Carlsborg Sewer Monthly Fees Not What They Appear To Be.

Exactly what is an ERU (Equivalent Residential Unit)?  It is a fixed BASE RATE and a RATE THAT IS DETERMINED BY WATER CONSUMPTION.  We have heard for years now that Clallam county officials "don't know what the monthly costs per home will be" and "when we know you will know".  This post is about the monthly fees, I'll get into hookup costs in a later post.

We have heard "estimates" of $60.00, $68.00 and now $70.00 per month just to pipe sewage away from your home, but wait that's not all of the monthly costs.  Let's see that BASE RATE and WATER CONSUMPTION RATE from Clallam County Public Work Department Frequently Asked Questions August 15, 2014.

The Base Rate is "estimated" to be $26.00 per month and the Water Consumption Rate is based on an "estimated" 125 gallons of water per day (gpd) at a rate of $8.66 per one hundred cubic feet of water per month or $0.0866 per cubic foot.  Thus an average family consuming 125 gallons of water per day would have a monthly sewer bill of $70.00.  So, how many cubic feet are there in 125gpd? That is 125gal/7.4805 gallons in a cubic foot would be 16.71 cubic foot of water. Ok you say, that don't look so bad, but wait, there's more.

The EPA states, "The average American family of four uses 400 gallons of water per day. On average, approximately 70 percent of that water is used indoors, with the bathroom being the largest consumer (a toilet alone can use 27 percent!)."  Hey! what happened to that 125gpd?  yeah I thought it was kind of low too. http://www.epa.gov/WaterSense/pubs/indoor.html

I will break it down and show you how much you may actually end up paying per month just to pipe poop away from your home using a statement made by the Clallam County Public Work Administrative Director in his response to my inquires about "what is an ERU" and "how many ERUs will a typical home be assessed?"  Read the E-Mail Exchange below and you will see how it is all broken down and how much the monthly user fees may actually be.  Bob's response is in RED.

Bob Martin, P.E.
Clallam County Public Works
Administrative Director
(360) 417-2389
(360)417-2513 - FAX
bmartin@co.clallam.wa.us
From: B Frazier [mailto:bryand@olypen.com]
Sent: Thursday, December 04, 2014 12:37 PM
To: Gray, Steve
Cc: Martin, Bob
Subject: ERUs

Steve, Bob,

Steve per our conversation Dec. 5, 2014,  concerning ERUs and how many ERUs a typical household may be assessed?  According to the EPA a typical 4 person household uses 400 gallons of water per day (gpd).

The Carlsborg Sewer Financial Plan estimates 1 ERU to be 125 gallons of water per day (gpd) average volume charge/ERU. (Monthly Rates, Monthly Base Charge per ERU, Page 14). 

So, based on the EPA average of 400gpd and reading the per ERU in the financial plan of 125gpd I would equate that to be 3.2 ERUs per typical household of 4 or the gallons per day divided by the ERU.  Water consumption is not the same as wastewater generated due to water transmission losses, outdoor use (irrigation, car washing, or other “non-consumptive uses) and inflow/infiltration (I/I.)  In the case of Carlsborg Gray & Osborne used 125gpd/ERU plus actual I/I data from Sequim for estimating sewage flows.  The PUD in their 2010 water system report estimated future Carlsborg water consumption needs to be about 178gpd/ERU.

      400gpd EPA AVG. / 125gpd per ERU = 3.2 ERUs per average household of 4.  Is this the correct assumption of how ERUs will be assessed on each individual households water use per day divided by the 125gpd ERU?  No.  Each residence will be considered to be one ERU.  As outlined in the financial plan, monthly household charges are proposed to be calculated using a base rate (estimated to  be $26/month)and a consumption rate based on actual water consumption (estimated to be $0.0866 per cubic foot of water used.)  So a household with an average water consumption of 125 gpd, would have a monthly sewer bill of about $70.  ERUs are used to estimate design flows, to size pipes and pumps, and to estimate system costs and revenues.  They are not used to calculate monthly residential bills.  We will however base bills for commercial, industrial, and public facilities in part on the number of ERU’s they represent, which will of course vary depending size and type of user.  Of course ultimately actual rates and rate structure is subject to approval of a sewer use ordinance by the Board of Commissioners.

I do know that this is exactly how it is being done in Mason County, Belfair, Shelton, North Bay, Allyn, Beard’s Cove and Rustlewood and used the same FCS Group for their Financial Plan.

Sincerely,

Bryan Frazier
(360) 683-4424

Now it's my turn to use his own statement to prove I'm right.  RED indicates reference to his response to my inquiry.  I've checked my math believe me I double and triple checked it.  See below.  Oh yeah, I switched the e-mails around so you could read my inquiry and his responses first and then my reply to him.


Bob,

A comparison,

EPA average water consumption for a household of 4 is 400gpd / 7.4805 gallons per cubic foot = 53.47 cubic feet per day actual consumption x $0.0866 per cubic foot of water used = $4.63/day x 30days = $138.90/month + $26.00/month base charge = $164.90/month.  http://www.epa.gov/WaterSense/pubs/indoor.html

According to your explanation below, 1 ERU is 125gpd / 7.4805 gal per cubic foot equals 16.71 cubic feet/day actual consumption x $0.0866 per cubic foot of water used = $1.45/day x 30/days = $43.41/month + $26.00/month base charge = $69.41 rounded up to $70/month for those on meters.

Those on private well: CCDPW FAQ August 15, 2014 page, 7. 1 ERU is 150gpd / 7.4805 gal per cubic foot equals 20 cubic feet/day actual consumption x $0.0866 per cubic foot of water used = $1.73/day x 30/days = $51.90/month + $26.00/monthly base charge = $77.90/month +/- $.90 ($78.80 per FAQ).

So, 1 ERU =  125gpd x 3.2/ERUs = 400gpd EPA AVERAGE / 7.4805 gallons per cubic foot of water = 53.47 cubic feet per day actual water consumption x $0.0866 per cubic foot of water used = $4.63/day x 30/days  = $138.90/month + 26.00/monthly base charge = $164.90/month.

Just as I had stated in my e-mail today to you and Steve Gray the “, based on the EPA average of 400gpd and reading the per ERU in the financial plan of 125gpd I would equate that to be 3.2 ERUs per typical household of 4 or the 400gpd divided by the 125gpd/ ERU = 3.2/ERUs.”   Actual cubic feet of water consumption WILL determine the number of ERUs per household, according to YOUR figures and YOUR explanation, “monthly household charges are proposed to be calculated using a base rate (estimated to  be $26/month)and a consumption rate based on actual water consumption (estimated to be $0.0866 per cubic feet of water used)”.

Thank you for providing the answers to my inquiries concerning ERUs and verifying my mathematic formulas are correct.  Unless the county plans to charge a FLAT $70.00/month per residential unit and no more than that, period.

Sincerely,

Bryan Frazier
(360) 683-4424

As you can see the monthly rate has just gone WAY up "BASED ON ACTUAL WATER CONSUMPTION" to offset the cost of "INFLOW and INFILTRATION" into the sewer system, because they (Clallam County) have to pay the city of Sequim to treat it and pay per gallon treated.

I do believe that this "consumptive water rate" will be in addition to your monthly PUD water bill, so you get to pay for your water twice.  In AND out, isn't that nice?

Here is Mr. Martins response to my reply to him.  I'll ask now, does anyone really think the citizen of Carlsborg only use 125 gallons of water per day per every 1.85 people (ok 2 people)?  Really?  Take note he only refers to "WINTER RATES" Jan, Feb, March, Oct, Nov and December.  What happened to the Spring and Summer RATES?  People don't use water during the Spring and Summer?  Well the answer is that people use MORE WATER during the SUMMER months which increases the GALLONS PER DAY and would lead to higher "ACTUAL CONSUMPTION" which would lead to HIGHER SEWER BILLS as explained above.






Brian:

Just to clarify, your arithmetic below is fine, but the typical household in Carlsborg does not consume 400gpd.  The winter month average of 125gpd/residential customer was derived from actual metered water billings for winter months over a consecutive two year period (as shown in the attached excerpt from the June 2012 facility plan.)

The rate structure proposed in the financial plan rewards water conservation.  Obviously if someone does use 400 gpd, or 3.2 times the average residential water usage in Carlsborg, they will (and should) have a significantly higher sewer (and water) bill, as you have shown, but this will clearly not be typical in Carlsborg.  


Bob Martin, P.E.
Clallam County Public Works
Administrative Director
(360) 417-2389
(360)417-2513 - FAX
bmartin@co.clallam.wa.us




The "metered water billing" in Carlsborg Mr. Martin refers to are for 2004 and 2005 in the 49-82 thousand gallon range, however, for 2013 it was 19.8 MILLION GALLON TOTAL WATER PURCHASED in the Carlsborg UGA.  I THINK AN UPDATE AND SOME NEW MATH ARE IN ORDER FOR THE COUNTY.



 

 

Thursday, November 27, 2014

Hidden and Conflicting Cost "ESTIMATES" for the Calrsborg Sewer.


Costs Still Unknown
Wednesday, November 26, 2014
11:26 AM
Hidden and Conflicting Cost "ESTIMATES" for the Calrsborg Sewer.

Since the time that Carlsborg had been designated as an "Urban Growth Area" (UGA) there has been an ongoing attempt by Clallam County to construct a sewer system for the entire UGA.  Repeatedly the CITIZENS of Carlsborg have asked the county what the system will "ACTUALLY COST" to construct and how much will it "COST" each of us?  Repeatedly the county has said "we don't know what the costs will be, when we know you will know". 

About 20 Carlsborg residents voice opposition to proposed sewer
By Rob Ollikainen
Peninsula Daily News

Thanks but no thanks, they said in a public hearing to extend temporary zoning for Carlsborg, because the cost will be too high.

The ESTIMATED $15 million sewer and wastewater treatment plant is a joint project of Clallam County and the Clallam County Public Utility District.  (*emphasis mine in bold )

"We don't know the cost; we know that you don't know the cost,

Costs unknown

Commissioner Steve Tharinger said the reason the county hasn't hosted more forums is because the costs are still unclear. *

"Everyone needs to know that cost -- we don't know it yet," Tharinger said. *

Carlsborg residents question need for sewer system, infrastructure in such a rural community
Posted 8/9/2012
by Sue Forde
for Citizen Review Online

a member of the audience, said he is part of the “opposition group”.  The “biggest sticking point among the residents is money,” he said.  Sequim has a high population density.  Carlsborg does not.  It’s not feasible for a sewer system when Steve Tharinger was involved:  where are the numbers, how much.  “We got the runaround,” he stated.  You need to come up with real numbers – if you don’t, it’s inappropriate to shove this down the throats of the people in Carlsborg, *

Dave said the response is unsatisfactory.  “We’ve been going to these meetings for quite awhile now,” and still there is no idea  of the cost.  “I’m assuming if you’ll be piping to Sequim, it will have an enormous cost.  We need some numbers,” he urged.
McEntire responded that “as soon as we know the numbers, you’ll know.” *

The best the county has been able to come up with thus far are "ASSUMPTIONS, ESTIMATES AND PROJECTIONS.
Unfortunately these are NOT the numbers we have been asking for, we want the real "COSTS".  We already know this sewer system is "FINANCIALLY INFEASIBLE", we just don't have the population or the "need" for it.

This brings us to the Carlsborg Sewer Financial Plan, February 2014, (the PLAN).

The first 12 pages of this document are solely based on "ASSUMPTIONS, PROJECTIONS AND ESTIMATES"  not the real NUMBERS.*  The problem with these "ASSUMPTIONS" begin with errors in the Carlsborg UGA population, number of Residential Units, number of businesses and growth, which lead to errors in the "ESTIMATES", "PROJECTIONS" and "APPROXIMATIONS" of costs associated with construction, number of connections, connection costs and monthly user fees. 

The key concern is the erroneous "ASSUMPTIONS" in the number of "potential connections" available which has lead to erroneous "ESTIMATES" of the $68.00 monthly user fee or $816.00 annually, this fee is based on a "BEST CASE ESTIMATE" IF they can get the required number of hookups in the first two years.  IF they don't meet this goal then the monthly cost WILL  be higher, as well as the cost of individual hookups.

Thursday, November 13, 2014

SCIENTIFIC DATA DOESN'T EXIST.

Scientific Data to Support Clallam County's 

Claim of "The Known To BE Failing or Failed On Site

Septic Systems in the Carlsborg UGA Contaminating the 

Ground Water", DOESN'T EXIST! 

The following is my letter of request for information on April 26, 2011 to the county and PUD #1 and their responses. 

Dear Carol, BOCC
I am requesting the following under The Public Disclosure Act:
All documents identifying the location of the purported known failing or failed on-site septic systems in the Carlsborg UGA, the agency reporting the failures including the results and testing method used in determining the failures and the proof of science. The test results and the agency providing the proof of science and scientific testing method used in determining the failed or failing systems contribution to the nitrate load in the ground water in the Carlsborg UGA.
 Please call or e-mail when the documents are available for pick up.
Sincerely,
Bryan Frazier

This email will serve to acknowledge receipt of your Public Records Act request in your email dated 4/26/11 below to Carol Creasey, Clallam County, Department of Community Development.  The Department of Community Development has reviewed our records and determined there are no records in our department to provide…………………………………………………
 
Thank you and please let me know if you require any further assistance from Community Development.
Cindy Swegle
Administrative Specialist IV
Clallam County Department of Community Development
223 E. 4th St., Ste. 5, Port Angeles, WA 98326
(360) 417-2321, Fax (360) 417-2443

The Commissioners’ office is not in possession of any records responsive to your request.
Trish Holden, CMC
Clerk of the Board
Commissioners' Office
223 East 4th Street, Suite 4
Port Angeles, WA 98362
P: 360.417.2234
F: 360.417.2493

Dear Mr. Frazier,
In response to your latest records request for documents identifying the location of the purported failing or failed onsite septic systems in the Carlsborg UGA, the District is not in possession of documents fitting that description. You may want to check with the County.
Sincerely,
Carla Field Public Records
 Officer Records Coordinator Clallam County PUD
V 360.565.3255
F 360.452.9338

Saturday, November 1, 2014

Public Works Trust Fund Board.

Letter to Washington State Public Works Trust Fund Board.


The following letter to the Trust Fund Board lays out the errors in the Carlsborg Waste Water Facility and Financial Plan Amendment for the Carlsborg Urban Growth Area with links to the FACTUAL numbers for the Carlsborg UGA population, housing units and the actual number of commercial properties.  I invite all who read this blog to please feel free to check my facts and please read or re-read my earlier post on Clallam County Code Enforcement, Creating Paper Water and How to Misrepresent a Rural Area as Urban.



Dear Cecilia Gardener,

I have received a copy of the Carlsborg Waste water Facility Plan Amendment – DRAFT 2014.  I once again have serious and grave concerns about the financial feasibility of the Carlsborg UGA Sewer Project. It appears that the Facilities Plan and the Financial Plan are fraught with errors, ASSUMPTIONS and PROJECTIONS stated as facts.  Upon closer scrutiny it is fictional and wish fullness not reality.

To begin, the number of  potential ERU (equivalent residential units) hookups is erroneous, the math does not show the reality of the Carlsborg UGA as follows…

Their statement: Page 8-4, An estimated 484 ERUs, 78 residential and 406 commercial,
are located within the Initial Connection Area. 
http://www.clallam.net/PublicWorks/documents/CWFDraft2.pdf

Reality: 2010 Census Carlsborg CDP (census designated place) http://www.census.gov/2010census/popmap/ipmtext.php?fl=53:5310075 , Population 995, 547 Residential Dwelling Units of which we know that 334 of them are in EXEMPT Mobile Home Parks leaving a total of 213 Residential Units for potential hookup.

Carlsborg UGA Economic Profile:  http://www.clallam.org/SiteAssets/resources/economic-development-reports/Carlsborg%20UGA%20Economic%20Profile%20September%202011.pdf  Pages 16-18 List Of  UGA Businesses.  There are 113 Businesses in the Carlsborg UGA not 406 as seen in this Financial Plan.

Additionally, allowing a waiver of hook up for those that have septic systems younger than 20 years old defeats to entire purpose of the sewer system in its initial construction phase and may lead property owners to defer hook up until the mandated time to do so. Example: If you have an approved onsite septic system installed this year 2014 you would not have to hook up to the sewer until your system is 20 years old or fails and is non-repairable.  These approved onsite septic systems cost can cost $30 - $50 thousand dollars and require regular testing and maintenance at owners expense and this plan offers no real adequate financial compensation for abandoning their own system for the sewer.

In addition to these errors I am concerned about the hookup fee waiver of $7,476.00 per ERU dropping the cost of hookup from $7,976.00 to $500.00 per ERU which includes businesses.  Concerning the “Get Connected” Loan Program” loans up to $3,000.00 at 3% interest for hookup costs of which the repayments would go to the county “General Fund” instead of being earmarked for O&M of the sewer system. “plan assumes that the repayments (about $70,000 per year) would go to the County WITHOUT being restricted to the Carlsborg system.” Pages 14-15 of the Plan Amendment Appendix H. http://www.clallam.net/PublicWorks/documents/CWFDraft2.pdf  This $500.00 “incentive” is not a factual accounting of the real cost of hookup and abatement of the old system as this plan fails to add the footnotes from the Clallam County Public Works Department 1-Assumes sewer main on the same side of the road as the property.  2-Add $2,000.00 if County Road must be crossed. 3-Based on ESTIMATES assembled by the CCAC (Carlsborg Community Advisory Council).  This plan also does not include the REAL cost of abatement of the old system, their estimate is $750.00 in total.  Actual is much higher as pumping costs alone are $350.00 - $375.00 which does not include excavating the tank, crushing the top, backfilling the empty tank and recovering the tank. 

One must read this entire Financial Plan to discover the real monthly costs.  They state $66.00 per month, if you take advantage of the “GET CONNECTED” loan program add $30.00 per month to the cost, if you are a private well owner an additional $12.00 to the monthly cost or the cost of metering your well and paying additional water use fees.  That would make the monthly fee $107.00 per month for those on a private well if they take the “LOAN” which would create an EXTRAORDINARY financial burden on those in the Carlsborg UGA with an Estimated median household income in 2012: $26,656 (it was $28,103 in 2000) Read more: http://www.city-data.com/city/Carlsborg-Washington.html#ixzz3Hg9sEoW3  Estimated per capita income in 2012: $16,758,  Median Average Age 60.3 years.  UNEMPLOYMENT IN 2013 9.0%

The arbitrary nature of the monthly fees of $66.00-$70.00 for those on PUD water and the increase to $78.00 minimum for those on private wells is discriminatory and appears punitive for having a private well as there is no way charge a fee to those on private wells without requiring them to spend additional money to install a meter, which is also not mentioned in the Financial Plan.

In light of these errors and other facts, I feel this plan is financially infeasible and should be withdrawn from loan approval and the entire plan scraped in favor of the LAMIRD alternative with owner financed cluster systems. The Carlsborg area should be down zoned to alleviate the burden on the water supply, aquifers and river.

Your consideration is appreciated,

Bryan Frazier
 




Mitigated Determination of NON-SIGNIFICANCE?

Mitigated Determination of NON-SIGNIFICANCE?

MITIGATE: (verb)
1. to lessen in force or intensity, as wrath, grief, harshness, or pain; moderate.
With whom did the county "MITIGATE", themselves, excluding public opinion?
DETERMINATION: (noun)
 1. the act of coming to a decision or of fixing or settling a purpose.   
By whom, the county, again excluding public opinion?
NON-: 
1.  a prefix meaning “NOT,” freely used as an English formative, usually with a simple negative force as implying mere negation or absence of something. 
SIGNIFICANCE: (noun)
1. importance; consequence:
2. meaning; import: 
3. the quality of being significant or having a meaning: 
NON-SIGNIFICANCE: 
Having no importance, consequence or meaning of significance.
Clallam County  the Board of County Commissioner (BOCC), The Department of Community Development (DCD) have determined amongst themselves that the cost of the Carlsborg Waste water Facility (sewer), the impact on the groundwater in the Carlsborg Urban Growth Area (UGA) (the aquifers, Dungeness River and streams) and the financial burden it will create on the citizens of the Carlsborg UGA to be of no consequence, importance, meaning or significance.  
The county has done so while IGNORING public input and opinion and ignoring their own county codes,development standards and our HOME RULE CHARTER.  The following is my opposition to this MITIGATED DETERMINATION OF NON SIGNIFICANCE sent to our Planning Manager Steve Gray.

Steve Gray, Planning Manager
Clallam County Department of Community Development
223 E. 4th Street, Suite 5
Port Angeles, WA 98362
Email: sgray@co.c1allam.wa.us
Phone: (360) 417-2520

Dear Mr. Gray:
I am writing in opposition to the State Environmental Policy Act (SEPA) WAC 197-11
MITIGATED DETERMINATION OF NON-SIGNIFICANCE concerning the 2014 Carlsborg Wastewater Facilities Plan Amendment, Environmental Checklist Review, Case No. ECL 2014-00015.

Due to the Department of Community Development statement that you do not have the funding for Code Enforcement or Code Enforcement Officers, I believe that no further development should occur and no building permits should be approved until such time that the county can budget for and provide full time Code Enforcement throughout the county as required by the Home Rule Charter.  http://www.clallam.net/Board/assets/applets/2007_Charter.pdf

Section 4.25: Director of the Department of Community Development:
The Director of the Department of Community Development shall administer, enforce and advise the County Commissioners on all laws, except health, with respect to the environment, natural resources, and land and shoreline development, including, but not limited to, zoning, land divisions, environmental policy, building and fire codes, forest management, mining, agriculture, watershed planning, and floodplains.
(Emphasis Mine)

The Code Enforcement Officers shall take the necessary actions to correct the Code deficiencies and violations that exist in developments such as the Carlsborg Industrial Park in accordance with the Home Rule Charter and the Clallam County Codes and this should be completed prior to any further development or issuance of any building permits for the Carlsborg UGA including the Wastewater Facilities Plan (sewer system).

33.20.060 Development standards – Purpose and intent.
Development standards are established to ensure the compatibility of uses permitted within the Carlsborg UGA and to ensure the protection of the public health, safety and general welfare. All uses located within the Carlsborg UGA shall be subject to the development standards, as applicable, set forth in this section.

(2) Landscaping. Landscaping for commercial, industrial, mixed use, duplex, and multifamily developments shall comply with Chapter 33.53 CCC, Landscaping Requirements. The use of existing native and/or drought-tolerant landscape materials shall be utilized whenever possible, and may be used in lieu or in combination with existing plantings to demonstrate substantial consistency with the plant and screening standards of Chapter 33.53 CCC. The landscaping plan shall also demonstrate compliance with the following performance standards:
(a) Landscaped areas between public roads and parking shall be provided;
(b) Outside storage, garbage, recycling and maintenance facilities, and loading dock areas shall be screened from view from public roads and neighboring properties;
(c) Commercial/industrial development abutting residential areas shall include a landscape plan that describes tree/shrub species, size of plant materials, and the use of fencing, berms, or solid walls so that noise, light, and aesthetic impacts to residential properties are adequately minimized and/or mitigated.


(3) Off-Street Parking. Parking for commercial, industrial, mixed use, duplex, and multifamily developments shall comply with Chapter 33.55 CCC, Parking Standards. The parking plan shall also demonstrate compliance with the following performance standards:
(a) Duplexes and multifamily residences shall provide no less than 1.5 parking spaces per unit. Parking areas shall be located behind or under buildings where practicable; except that, attached garages shall be allowed for duplexes.
(b) The number of access points from parking areas to public streets shall be minimized or shall be shared (where possible) within a development.
(c) Parking areas shall include landscaping, fencing and/or berming substantially equivalent to the standards in Chapter 33.55 CCC when abutting existing single-family residences or residential zoning districts.
(d) Where practicable, parking for commercial developments should be located to the rear of the development site.
(e) Parking lighting shall not create off-site glare, and shall utilize “cut-off” type fixtures that ensure glare will be downward facing and/or shielded and directed away from neighboring properties.

Mr. Gray, I find the County and especially the Department of Community Development incompetent and lack the necessary skills to bring order and “balance” needed to create and maintain any community development.


Sincerely,




Bryan Frazier




Cc: BOCC, Washington Department of Ecology, Washington Environmental Protection Agency and the Washington State Public Works Trust Fund Board.